Khalzan Buregtei Project

A heavy REE deposit holding about half of Mongolia's total rare earth resources.

From mine to mixed rare earth oxide

The Pre-Feasibility Study confirmed the concept of a mine, concentrator and primary processing plant with a mine life of 30+ years.

01

Mine

30+ years

02

Production (per year)

13,000 t

03

Key drilling figures

135 drill holes

Where our studies stand

Completed · 2024

Pre-Feasibility Study (PFS)

Prepared in accordance with the international NI 43-101 standard.

In progress

Pilot-scale testing

Conducted in 2 stages: beneficiation and refining. The beneficiation stage tests were successfully completed in Q2 2025. The concentrate will feed the refinery-stage tests, which are scheduled for completion in Q1 2026.

In progress

Definitive Feasibility Study (DFS)

Scheduled for completion by Q2 2026, the study is being carried out with Wood and Stantec, companies with international experience in this type of mineral.

In progress

Environmental and Social Impact Assessment (ESIA)

Carried out jointly by Sustainability East Asia and SLR Consulting in line with IFC and Equator Principles 4 standards. The baseline study has been successfully completed. The study spans a 24-month period.

Myangad soum, Khovd Province

The Khalzan Buregtei Project is located in Myangad soum, Khovd Province, in western Mongolia. The project site is easily accessible by road and via the airport in nearby Khovd city.

From Ulaanbaatar

1,600 km west

From Khovd city

60 km

From Myangad soum

20 km

China-Mongolia border

389 km southwest, connected by road

Халзан бүрэгтэй төслийн байршлын зураг
Figure: Location of the Khalzan Buregtei Project on the map of Mongolia

Alkaline granite-type deposit

Хүдрийн чулуулгийн ойрын зураг

In Mongolia

6 deposits, 80 occurrences and about 300 mineralized points

Total national resources

3.1 million tonnes of total rare earth oxide (TREO)

Discovered

1984, by a joint Russian-Mongolian research team

Ore body

About 500 meters in diameter and about 200 meters deep

Main minerals

Bastnaesite, synchysite, zircon

The Khalzan Buregtei deposit is an alkaline granite-type deposit containing heavy REE. The orebody is approximately 500 meters in diameter and has been delineated to a depth of about 200 meters; its main minerals are bastnaesite, synchysite and zircon.

The deposit was discovered in 1984 during a joint Russian-Mongolian geological survey. It can be mined by open-pit methods with a low stripping ratio.

135 drill holes, 30,395 meters

As of the end of 2023, drilling had been successfully completed over an area of approximately 1,000×500 meters.

41

drill holes, 2012–2013

94

drill holes added since 2021

99%

average core recovery

20–100 m

drill hole spacing

Exploration drilling was carried out in two phases: 41 holes in 2012–2013, and an additional 94 holes since 2021.

As of the end of 2023, a total of 135 holes and 30,395 linear meters had been drilled. Average core recovery is 99%, with hole spacing of 20–100 meters.

Өрмийн машин ажиллаж буй нь
Өрмийн кернийн дээж хайрцагт
Геологич кернийн бичиглэл хийж буй нь

Why rare earth elements matter